Haunted Profile A001: Haunted Road 01, Karak

3:37 PM GMT+8, Sandakan, Sabah, Malaysia




As we all know, Karak Highway is one of the most haunted road in Malaysia. With records of traffic accidents, why shouldn't it be haunted and with the latest movie from KRU studio's about this highway you would think twice now before using that road (meh...people gonna use it anyway). To think that im going to Unisel makes me wonder if someday I might be experiencing that haunting myself. Sometimes it might just be the imagination of a tired driver ya know, that's what causing all of the accidents. Believe what you want to believe....my advice, drive safely on the road...prioritize those loved one who waits for ya....or maybe it's the grave who waits for you...D.F.J..signing out...

Highway Detail
NameLebuhraya Kuala Lumpur - Karak (E8)
Length (km)60.00 Kilometer
Date opened30-Apr-1999
Date built03-Okt-1994
NoteProjek ini telah diswastakan kepada MTD Construction Sdn Bhd dan telah dipindahkan (Novate) kepada MTD Prime Sdn Bhd. Ianya bermula dari Kuala Lumpur di km 19.2 dan berakhir di Sungai Dua, Karak, Pahang di km 79.2. Pembinaan bermula pada Oktober 1994 dan siap 4 1/2 tahun selepas itu. Sebagai laluan utama yang menhubungkan antara Pantai Barat Semenanjung dengan Pantai Timur Semenanjung, ianya akan membawa pembangunan kepada persekitarannya.
Fakta Teknikal
Tarikh Mula KonsesiJulai 1994
Tarikh Tamat KonsesiMei 2021
Tempoh Konsesi27 Tahun
Panjang60 km
Persimpanngan Bertingkat2 buah (Dibina oleh Syarikat Konsesi)
Bil Tol Plaza2 buah - Plaza Tol Gombak dan Plaza Tol Bentong
Bahagian A
Seksyen 1 - bermula daripada KM 19.20 hingga KM 37.0 (sepanjang 17.8 KM). Tempoh perlaksanaan 33 bulan dan siap pada 27hb. Julai 1997.
Sekyen 2A - bermula daripad KM 37.0 hingga KM. 45.5 (sepanjang 17.8 KM). Tempoh perlaksanaan 43 bulan dan siap pada 27hb. Julai 1997.
Syekyen 2B - bermula daripada KM 45.5 hingga KM 62.3 (sepanjang 16.8 KM). Tempoh perlaksanaan 45 bulan siap pada 27hb. September 1998.
Bahagian B
Seksyen 2C - bermula daripada kilometer 62.3 hingga lkilometer 79.2 (sepanjang 16.8 KM). Tempoh perlaksanaan 53 bulan dan siap pada 27hb. Julai 1999.
Bahagian X
Bahagian X yang bermula daripad kilometer 15.5 hingga kilometer 19.2 akan diserahkan semula kepada JKR kerana terlibat dalam projek Jalan Lingkaran Tengah
II bagi pakej III dan IV yang dikendalikan oleh JKR.